The Napkin Protocol

Nobody kills a concept by taste-policing here. The gate criteria do.

Innovation projects rarely die because the idea on the napkin was bad. They die because nobody was willing to wipe their mouth with it and throw it in the bin. The Napkin Protocol makes that uncomfortable moment into a method instead of a conflict, and it isn’t new…

01 / Origin Story

It had no name yet, and it still worked.

Long before “Napkin Protocol” had a name, the shape of it was already there. That’s just how good physical products actually get made. A pram our founder, Kasper, built for Ønskebørn, under the name STORK, is a textbook example when you look back at it through these four steps.

01.1 / Napkin Dump

Meant getting everything on the table before a single line was drawn. 1,932 survey respondents and 50 individual user interviews, all collected before concept work even started.

01.2 / The Wipe

Meant refusing to try to be everything to everyone in a market owned by a handful of big, established brands. Instead, a narrow, non-negotiable set of criteria: the largest lying surface on the market, folded into the most compact frame around.

01.3 / Fold Test

Was, quite literally, a folding test. Could the concept fold into reality, physically and technically, small enough to fit in the trunk of even the smallest car? That single question produced seven patents on its own.

01.4 / Napkin to Line

Took the concept from idea to a launched, production-ready spec. The result was 7 patents and a 19% market share in the first six months, in a market that usually takes years to break into.

This isn’t a story we rewrote afterward to fit the method. It’s the proof the method works, because it describes a process that was already producing results long before it had a name and four tidy headings.

02 / The Method, Every Time

Four Steps.

Step 1 / 15–40 concepts

Napkin Dump

Get everything out of your head and onto the table, unfiltered. A broad sweep of concepts and “what if” ideas from across the organization: engineers, sales, clinicians, users. The goal is volume and honesty. Quality comes later.

Step 2 / 5–8 concepts

The Wipe

This is the uncomfortable one. Concrete, pre-agreed criteria, technical realism, regulatory complexity, market size, strategic fit, cut what never should have survived the meeting in the first place. Nobody kills a concept here. The criteria do.

Step 3 / 2–3 concepts

Fold Test

Can it actually fold into reality? Technically, commercially, regulatorily? Fast, cheap pre-validation per concept: rough prototypes, expert interviews, feasibility checks, an early read on production. Just enough evidence to make a confident call.

Step 4 / 1 concept

Napkin to Line

The chosen concept moves from sketch to a production-ready spec. Full engineering, DFM/DFA, supplier selection, a ramp-up plan. This is where the hands-on part of the team really takes over.

03 / Proof Point

Not just a decades-old story either.

On a recent combination-product program for a biotech client, this same process took a blank scoping brief to a decision paper shortlisting three validated concepts, complete with usability data, a manufacturability assessment, and investment estimates. Five weeks, start to finish. See the case →

From napkin to factory floor.
© Napkin Engineering Group
All Rights Reserved.
CVR 40113142
05.1 / Find us

Napkin Engineering Group
Brønsholmdalsvej 119
2980 Kokkedal
Denmark

05.2 / Get a hold of us

hello@napkineng.com
+45 31 4000 90